Bar Plot from Scientific Research

Open access visualization of Bar Plot, Error Bars, Clustered, Levelized Cost of Energy, Perovskite PV Systems
CC-BY
0
Views
0
Likes
DOI

LCOE of residential and utility-scale perovskite PV systems under recycling (three times) and landfill scenarios. Three device lifetimes are considered: 5 years, 10 years and 15 years. Therefore, the total service times are 5 x 3 and 10 x 3 and 15 x 3 years considering repeated recycling for the three scenarios to emphasize the importance of considering both lifespan and recycling times when assessing the economic efficiency of perovskite solar cells. The error bars convey the uncertainty in the LCOE estimates, reflecting a ±20% fluctuation in crucial input factors. This variability includes the expenses linked to energy consumption, labour, materials and equipment, all of which are integral to the processes of recycling, remanufacturing and reinstalling PV modules. ETL, electron transport layer; HTL, hole transport layer.

Related Plots

Discover More Scientific Plots

Browse thousands of high-quality scientific visualizations from open-access research