Raincloud Plot from Scientific Research

CC-BY
4
Views
0
Likes
Citation
Ratio between maximum MI(R;S) value during post-training and the maximum MI(R;S) value during pre-training, calculated on each putative neuron that was tracked across the two imaging sessions (n= 849 neurons in seven mice). MI(R;S) and ratios were calculated separately for stimuli 3 and 6 (also used during training, left), for stimuli 1 and 4 (center), and for stimuli 2 and 5 (right). Data were pooled across cortical depths. Black bars indicate the mean for each distribution.
Related Plots
Browse by Category
Popular Collections
Related Tags
Discover More Scientific Plots
Browse thousands of high-quality scientific visualizations from open-access research