Line Plot from Scientific Research

CC-BY
362
Views
0
Likes
Citation
Optimized production cost of green ammonia as a function of fraction reduction in energy during lean months (relative to peak months). In simulations of with the ramping HB process, the scheduling option for 7 days shutdowns was provided. A constant energy cost of 2.5 /kWh and lineal scaling factors for cost estimates are assumed.
#Line Plot#Production Cost#Green Ammonia#Energy Reduction#Lean Months#Ramping HB Process#Shutdowns#Energy Cost
Related Plots
Browse by Category
Popular Collections
Related Tags
Discover More Scientific Plots
Browse thousands of high-quality scientific visualizations from open-access research