The left side shows that of the four permissible scenarios leading to a green hydrogen classification according to the delegated acts, two are selected for further analysis. As a counterpart, an impermissible power purchase scenario is presented that does not result in a green hydrogen classification. The right side shows that, due to simplifying assumptions regarding taxes and grid fees, the two permissible scenarios are merged into the Renewable scenario, while the impermissible scenario becomes the Mix scenario, for further analysis. Additional scenario information is as follows. Exceptions of conditions on additionality, temporal correlation and geographical correlation apply for the DC + PPA scenario if either the emission intensity of grid electricity on annual average or the day-ahead market coupling prices fall below specified lower thresholds in the respective bidding zone. In the case of the DC + Renewable Grid scenario, the hydrogen production must not exceed a maximum number of hours set in relation to the proportion of renewable electricity in the bidding zone. More detailed information can be found in the delegated act I (ref. 1 ). Art., Article.